Showing posts with label Goals. Show all posts
Showing posts with label Goals. Show all posts

Monday, January 14, 2019

Long Time no Post

It has been over a year since I posted on here last but I wanted to restart this to keep myself up to date on  various Crafting Projects and Stitch-a-longs. My last post on here was 9/27/2017 so definitely too long.  I figured I would split this up into multiple sections to get caught up:

1. Goals
2. SALs
3. Stash Report


1. GOALS:
    Cross Stitching:

  • Year of Ink Circles: All new starts for the year must be Ink Circles patterns
  • Stitch from Stash: no new Patterns, floss and or fabric except fabric of the month from Under the Sea Fabrics and Seraphim Hand-dyed Fabrics. This will be tracked via a facebook group.
  • Finish #stitch9challenge sponsored by @farmgirl on instagram
  • Make Progress on my WIPocalypse.
  • Organize my craft studio
    Quilting:
  • Complete 5 Quilt tops this calendar year
  • Complete 2 table runner commissions
  • Complete Baby Quilts as needed
    Knitting
  • Knit a Dishrag a month
  • Complete 3 pairs of socks this year
  • Complete Baby Blankets as needed
  • Complete one knitted wrap this year

2. SALs
  • Stitch9challenge: finish the 9 projects I identified which are:
    • Heart of the Home by Stitchrovia
    • ABC's of Halloween by Lizzie Kate
    • Pretty Little Tokyo by Satsuma Street
    • Pretty Little Sydney by Satsuma Street
    • Cirque des Coeurs by Ink Circles
    • Chalkboard Mandala by Ink Circles
    • Tapestry by Ink Circles
    • Coastal Cola by Silver Creek Samplers
    • Autumn Sampler (blue Colorway) by *** (I will add it in later)
  • WIPocalypse: Try to finish at least 10 projects. I will use the above plus Rosie the Riveter by Hornswoggle studios.
  • Magical Stitches and Literature Challenge on Facebook.
    • weekly/monthly/yearly challenges for reading and stitching related to the Harry Potter books.
3.Stash Report
  • Report monthly purchase and usage of Fabric, Floss, and Yarn.

I will be updating the background, sidebars, and pages of this document in the near future.

Happy Stitching!

Tuesday, January 3, 2017

2017 - WIPocalypse Check-in

This is the initial 2017 WIPocalypse Check-in. Each month we are to check-in with our progress on certain stitchy projects. I will be updating the Side bar to the left with my projects as I work through them. The prompt for this month is to introduce ourselves, our projects, and any goals we have for ourselves.

My Name is Katie. I am a mechanical engineer by training with a Ph.D. in my field. I continue to work as an engineer by day and craft when I get the chance at night. I am married but have not been blessed with children at this time so that does give me more time to craft :). My dear husband is very good at putting up with my crafting addiction and loves to see what I can create.

As for my Stitchy goals for this year, I would like to be better at check-ins for WIPocalypse 2017. The projects that I want to work on are half new starts and half WIPs.

New starts:
Cirque des Cercles
Cirque Des Carreaux
Toronto of the Pretty little Cities series
Noah's Submarine
USA - Thea Gouverneur

WIPs:
Pinocchio - When you wish upon a star
Santa and Westie Stocking
The ABC's of Family
Snowman Ornaments
Brigid's Shamrock - HAED - 3 pages for the year or more complete

I also have goals of only stitching from my stash except for the 10.00 budget I have given myself.

Let's hope this works out to accomplishing a lot!

Happy Stitching!

Plans for 2017

I spent the New Year in MN with my dear husbands family and while I was relaxing I spent some time thinking about my plans for 2017. I put my overall crafting goals on a Tab in the top toolbar labeled 2017 goals. They can also be found below:

2017 Crafting Goals
Stash:

  • Spend no more than $10.00 US per month on Stash of any kind
  • Catalog all yarn on Ravelry
Overall:
  • Make a catalog of completed Projects
  • Keep track of time spent on Crafting
  • Start Christmas gifts early
Yarn:
  • Complete 2 hats
  • Complete 3 pairs of socks
  • Complete 2 shawls
  • Make 2 more feet of progress on my Brother's Blanket
  • knit 20 dishrags
  • Baby Quilts as Needed
Cross Stitch:
  • Complete 3 total pages on Brigid's Shamrock
  • Complete 4 cities
  • Start Noah's Submarine
  • Ornaments for the Family
  • Stockings for the husband And I
Quilt
  • 2 quilting weekends with my Aunts
  • 5 quilt tops
  • Finish aprons
I also wanted to think through the plans for Stitch-a-long's, Quilt-a-alongs, etc.
My plan is to keep up with the Small's SAL and do my best to keep up with the WIPocalypse SAL as well. I was not the best at these in 2016 but I plan to do better in 2017.


Friday, October 7, 2016

Monthly Goals - October 2016

I realized as I look back on my Blog for this year I have not kept up with my progress like I would have liked. I asked myself the tools I used to stay up the date and one of the best was monthly goals.
October 2016 Monthly Goals:
  1. No craft stash shopping
  2. Blog once per week
  3. Finish a dish rag a week
  4. Complete Pretty Little Italy
  5. Finish Purple Zig Zag Quilt top
  6. Start ornaments for the holidays.


Hopefully they are achievable as I have a vacation at the end of the month.

Happy stitching everyone!

Tuesday, February 2, 2016

The First sock

So I finished a sock....only one though. The other is still on the needles. We shall see if it comes out the same size as the first one. I keep finding myself having issued where I joined the stitches in the round showing up in my stitching. This is something I need to figure out. I also need to figure out kitchener stitch. Hopefully the second sock will help me practice. Here is my lonely single sock.



I also finished a dishrag for January :)

So at least some of the goals for the year are on track!

Happy stitching!

Saturday, January 2, 2016

2016 Goals

I decided to do some Blog cleaning for the new year just in time for setting goals for 2016. Those goals for 2016 are as follows:

2016 Goals:
Overall:
  • Inventory
  • Organize, Organize, Organize
  • Make an album of Completed Projects
  • Bog at least once a week :)
Stitching:
  • Take Part in a Stitch Retreat
  • Only Stitch from my Considerable Stash
  • Make progress on - Brigid's Shamrock and Noah's Submarine
  • Finish: ABC's of Family, Santa from H*LL, One Nation, 99
  • Ornaments for the kids
Quilting and Sewing:
  • 4 quilt tops: A&P, K&C, Mom's and Noel's
  • Zipper Pouches
  • Organize Scraps
  • Farmgirl Vintage and/or Tula Pink's 100 quilt blocks
Yarn:
  • Learn to knit Socks
  • Complete 2 pairs of Socks
  • Complete 3 hats
  • 4 baby blankets
  • Brother's Quilt
  • Dishrag a month
  • buy no yarn 
Some of these are going to be rather stretching at this point with my workload from my regular job but I am hoping that I can meet them.

I will be posting updates this week with what I have been working on over the holidays.

Friday, August 28, 2015

Stitch from my Stash 2015 part B - August 2015

It's time for Stitch from my Stash Check-in for August 2015. I wish I had pictures but my camera and phone died within 24 hours of one another and I am working to get that solved. But here is my progress for the month:

Month: August Spent: $0.00 Earned: $0.00 
Carryover from July: $35.00
Carryover to September: $60.00

I should be able to post pics too.

Happy stitching everyone!

 

Friday, June 26, 2015

Monthly Goals Check-in: June 2015

Here were my monthly goals for June 2015 and where I netted out:

June 2015 Goals:
1.) Post at least 4 times this month - FAIL
2.) Get caught up on posts of finishes- COMPLETE
3.) Complete Cross- stitch of Stocking for a friend - FAIL
4.) Get Batik Bricks quilt to Long armer prior to vacation (That means finishing piecing the top too) - FAIL
5.) Complete 4 Christmas ornaments (These are great car trip tasks) - FAIL
6.) Finish gender neutral baby blanket and post about it- COMPLETE
7.) Tuck in all the ends on knitting projects (It is my least favorite thing to do so I need to make it a goal to get it done.- COMPLETE

With the impromptu out of state Funeral, I am considering the ~43% completion rate a success. I am about an hour or 2 away from completing the Christmas Stocking for my friend and will complete the Batik bricks quilt this weekend. So where do I go from here...

July 2015 Goals:
1.) Stitch from My Stash: really craft from my stash period
2.) Blog at least 5 times
3.) Complete Batik Brick quilt top and get it to the longarmer
4.) Get fabric picked for A&P wedding quilt and ET baby Quilt
5.) Complete in progress shawl and Cowl
6.) Complete 4 ornaments
7.) Complete Stocking and give to Friend
8.) Work on 2 other stitching WIP

Happy Stitching Everyone! 

Tuesday, May 26, 2015

May SFS 2015-A Check-in

Here is my Check in for May for SFS 2015-A:

Month: May
Spent: $12.00 (3 yds of Clearance fabric for binding of future quilts)
Earned: $16.00 (Santa's Office)
Carryover to April: $145.00 (April Carryover 116 + 4 (from Above) + 25 from this months budget)

All in all, this month has been a good one from a budget perspective.

I have decided that I need to get back to setting monthly goals for myself as I have been slacking in the posting department.

So here are my monthly goals for June: (keeping in mind I have a 12 day vacation in Here)

June 2015 Goals:
1.) Post at least 4 times this month
2.) Get caught up on posts of finishes
3.) Complete Cross- stitch of Stocking for a friend
4.) Get Batik Bricks quilt to Long armer prior to vacation (That means finishing piecing the top too)
5.) Complete 4 Christmas ornaments (These are great car trip tasks)
6.) Finish gender neutral baby blanket and post about it
7.) Tuck in all the ends on knitting projects (It is my least favorite thing to do so I need to make it a goal to get it done.

Happy stitching everyone!

Wednesday, April 22, 2015

LONG time no Post

I realized today that it has been a really really really long time since I posted some progress pics of any crafting on here! I am going to blame it on the fact that I have been on a work travel schedule where I am gone more time than I am away for the past 9 weeks. It has become exhausting. So when I am home I try to get a few things done but not a whole lot. On my trips I am working various shifts in a manufacturing setting so when I get back to my hotel...all I want to do it sleep. Hence...my update from the hotel before I leave for the airport to go home. I have finished 2 things in these 9 weeks but only took a pic of one. But that one has a hugely sentimental meaning to me.

    
Aunt B's Purple Quilt - completed Easter 2015

About a year ago as I completed my first quilt, My Aunt B (in the pic with me above) approached me with a quilt project that she started 32 years ago. All of the blocks were had sewn or appliqued on muslin and sashed with some other fabric. To be honest outside of the blocks, the fabric was in a sad state. The blocks themselves were coming apart at the seams. but my Aunt B asked me to make it into a throw quilt she can use on the couch. If you look at the quilt above, the top 2 corner blocks, the left middle, center, left bottom, and bottom right were hers and the others I added. I machine appliqued over all of the hand sewing she had completed. I replaced the sashing with some purple butterfly fabric (butterflies have special meaning to my mom's family), added a purple border and backed it with leftover scraps.

This project scared me as I had never done machine applique in my life but it worked out and most importantly, I was able to finish a project that was 32 years in the making!

Happy stitching!

Tuesday, January 13, 2015

30 Days of New Starts - Check-in #3

If I have realized anything in the plan to start/work on different things every day for 30 days...I need to plan...plan...PLAN. I am living by a spreadsheet that I have set-up for myself and I made sure not to inset too many large projects as I always want to work on them more that a few hours each night. As for what I have been working on, here we go:

1/8: Cocoa Mug Cross Stitch: This kit is so much fun. Each of the 6 is relatively small and gives a great sense of accomplishment.
Cocoa Mug - Dimensions Kit?
From my stash
1/9: Red and White Ornament: This ornie is one of my go to designs for each year. There are just so many color ways that can be played with that I am always trying something new.
St. Charles - Ink Circles Designs
Scrap of Linen and Floss from my stash
1/10: Purple baby Blanket: The first baby blanket of the year needs to be completed by 2/9 for a work friend who is having her third child. She is so excited because (in her words), "when you are on #3, no one thinks of really doing anything for you." I am glad I can make her happy.
Purple Blanket
Caron - Simply soft
Basket weave pattern on size 10 needles
1/11: Dish Rag - Block #5 Pinwheel
Pinwheel - Lily's Sugar and Cream Cotton
1/12: Snow Man Ornaments - Ski's - This little guy is from a Herrschners Kit and has a snowman riding on Skis. I made some great progress for only working on it 1 day.
Snowman on Skis
Herrschners ornament Kit


Well, it looks like I am all caught up on my 30 days of projects. I am slightly amazed at what I have been able to accomplish once I put my mind to this endeavor.

Happy Stitching Everyone!


Monday, December 29, 2014

Yearly Goals Check-in and 2015 decisions

As we get close to the end of 2014, I wanted to check-in on my goals for the year. I set them last in December of 2013 and I added my status on them in purple below:

1.) Adhere to stitch from my stash SAL.  - COMPLETE. I adhered to the rules of the SAL and feel like I made some changes to my spending habits. I also promised myself that I would save my money for a new sewing machine and was able to purchase that they day after Christmas I got a PFAFF quilt expression 4.2 and I love it. I am sure there will be pictures of it forthcoming.
  
2.) Complete "The Lady and the Flag", the ABCs of family, 2 other mandalas, and my adaptation of the Dreamcatcher lap blanket.


  • The Lady and the Flag - COMPLETE
  • the ABC's of Family - no progress
  • 2 other seasonal Mandalas - COMPLETE
  • Dreamcatcher - COMPLETE
I think if I hadn't picked up quilting as another hobby seriously, I would have completed the ABC's of Family but overall..I think I made a Huge dent in the projects I wanted to get finished.
3.) Complete ornaments for the whole family (7). - COMPLETE. I actually finished 8 of them this year. 
4.) start 2 bigger projects: Noah's submarine and Brigid's shamrock. - No Progress - I kitted the projects up but did not start them - again I blame too many hobbies. :)
5.) finish/finish the advent calendar. - COMPLETE - I totally forgot that I even put this one on here but I finished it right before the end of the year. 
6.) complete piecing together 2 quilt tops, 4 sets of placemats and coasters, and 1 Christmas table runner. 


  • 2 Quilt Tops - Completed 3 actually, 2 of them were longarmed, and one of those was bound and given as a gift this Christmas to my grandmother.
  • 4 sets of placemats and coasters - completed 3 placemats and 1 coasters
  • 1 Christmas Table runner - completed 1 for christmas, and 2 for gifts.
7.) 3 knitted baby blankets: (1 already assigned) - COMPLETE
8.) learn to knit socks. - Not Complete


All in all, I think it was a productive year. I am hoping and planning on doing more in 2015. So here are my goals for this year:

2015 Goals:

Overall: 
1.) Stitch from my stash on all types of crafting
2.) Complete my craft room
3.) inventory patterns and kits 
4.) Work on something new (either a start or a WIP) on any crafting every day from Christmas to january 25th - (i had to adjust the days due to a work trip) - to honor Deborah Faris Bryant

Yarn: 
1.) Complete 4 baby blankets - 1 is spoken for and 3 more (boy, girl, and neutral) to have in reserve.
2.) Learn to knit socks
3.) knit a pair of socks for my hubby
4.) Complete 2 hats for friends
5.) Complete 4 ft on my brothers blanket
6.) Complete 18 dishrags ( I need to get my reserve of this type of yarn down)
7.) Complete hitchhiker and 2 more shawls/wraps

Stitching:
1.) Complete ABC's of Family
2.) Start Brigid's Shamrock and Noah's submarine
3.) Complete 12 ornaments
4.) Complete 4 other larger projects including the Santa from H*ll

Sewing/Quilting:
1.) Learn Free Motion Quilting
2.) Complete 3 quilt tops - (1 is already spoken for)
3.) Bind my first quilt
4.) Complete purple quilt for my aunt.

The list is daunting but I feel like I am up to the task.

Happy Stitching Everyone!

Wednesday, December 3, 2014

December Goals and November Check-in

I am a few days late for my Goals Check in for November but here we go. The goals I set for November were:

November 2014 goals:
1.) Complete Boys baby Blanket - Done and gifted to his owners parents in preparation for his birth.
2.) Complete Seed Stitch Wrap - FAIL - I am in the last color stripe...I have about 4 more inches to knit. Hopefully I can get it done this weekend in preparation for my grandmother's travel to my house for the holidays.

3.) Complete 2 ornaments for my Niece and Nephew - Done and Done plus 2 more. See my previous post.

4.) Blog twice per week including the Santa from He**. - FAIL - I blogged but with no frequency and not about the project I cannot stand right now. It is a Santa that a lady from my day job has had partially completed for 10 years and gave it to me to finish.

5.) Decide on yearly goals. - DONE - they will be covered in a future email when I check in on this years goals.

6.) Work on 2 other WIPs - FAIL - well sort of...I completed finished the Advent calendar and hung it on my wall for the month of December. It had been stitched but not finished.



Now for December Goals:
1.) Decide on SALs to take part in next year.
2.) Make a year end summary blog post and show Santa in Blog
3.) Bind 2 Quilts
4.) Finish Quilting and bind quilt for my Aunt.
5.) work on whatever else I want.

Happy stitching everyone!

Monday, July 21, 2014

IHSW check in

This past weekend was International Hermitting and Stitching weekend for the month of July. The goal is to spend as much time stitching as possible. I had the greatest of intentions and did make some great progress but I did spend some time traveling in the car to the Pro Football Hall of Fame in Canton, Ohio. While in the car I did start a new traveling knitting project: The Hitchhiker Shawlette.

I was able to complete 10 points out of 42 for the shawlette. Not bad for some in car progress.  I chose to spend the time I was home on the Dreamcatcher. I was able to finish everything except some backstitching and about 15 stitches of Full Cross.  At my last check in, I was in the bottom right corner.
Progress as of 7/10/2014
At the culmination of this past weekend (7/20/2014), I was on the last corner.
Dreamcatcher - progress as of 7/20/2014
I should hopefully have this one completed by this evening or tomorrow evening at the latest. Then it will be onto working on the Lady and the Flag.

Happy Stitching everyone!

Friday, July 11, 2014

July Turtle Trot/Wipocalypse Check in and Progress!

First...I am slacking on my posting this Month but I do have some progress on one of my TurtleTrot/Wipocalypse projects. I have been working on getting Dream Catcher completed. My last post on it showed progress to this point:

Dream Catcher progress as of 6/23/14
I have turned the corner on the bottom left now and am in the home stretch as with the progress pic below:
Dream Catcher progress as of 7/10/14
I also have been working on the seed stitch wrap and made another color change. I am at 25.6" which exceeds my goal of hitting 10 more inches or 25" total from the month of July. 
Seed Stitch Wrap progress as of 7/10/14

I also celebrated my Nephew's Birthday the first weekend over the fourth of July and made him some "Thomas the Tank Engine" pillows. He was so excited with them and at 3 there is not much his Aunt can get him excited about toy wise :).


This weekend I would like to finish the Dream Catcher and finish my Christmas Table Runner. Happy Stitching everyone!


Friday, June 27, 2014

July Goals

I figured I should check in on my May Goals (yes..A month Late) before I lay out my July Goals. So away we go:

May Goals Check in:
1.) Complete Winter Mandala: DONE
2.) Complete Binding on Patriotic Table Runner: DONE (my MIL loved the table runner as it was a gift for her birthday. I forgot to get a picture so I will have to have her send me one)
3.) Complete Christmas Table Runner Top and Quilt it: Top done but Not Quilted together so HALF DONE
4.) Complete Geometric Placemats: Didn't even touch them in 2 months (yikes!)
5.) Complete 10 inches of the seed stitch wrap: DONE (it now measures 15" and 10" of it was finished by 5/28)
6.) Work on Another WIP - Worked on Dream Catcher: DONE
7.) Stich from my Stash - May: DONE and June: Not even close

Since I will be back in my home for the bulk of July, I have decided to set some daunting goals for July.

July Goals:
1.) Complete Christmas Table Runner
2.) Complete geometric Placemats
3.) Knit 10" more on Seed Stitch Wrap
4.) Finish Dream Catcher
5.) Complete Stitching on Lady and the Flag - my MIL wants to do the beading on her
6.) Blog at least once a week.
7.) Stich from my Stash - Spend nothing
8.) Start on a new baby blanket - Already assigned to a future little man.

Happy Stitching Everyone!

Thursday, May 1, 2014

Monthly Goals Check-in

My Goals for March were very stretching and my progress was mixed:

1.) Complete Pinky Baby Blanket - YES
2.) Complete stitching on 3 Christmas ornaments - YES - 2 Ink Circles and NOEL
3.) Start Winter Mandala - YES - completed the black outline and some color
4.) Completely finish the Advent Calendar - NO - didn't even pick it up
5.) Complete 4 placemat sets and 1 Table Runner - NO only 35% - patriotic table runner needs bound, christmas table runner top was laid out and is partially sewn together, completed Ohio State Placemats.
6.) Digitize craft inventory - NO only 30% complete - finished yarn only
7.) Stitch from my Stash - YES - even have carryover to next month
8.) Blog twice per week - YES in number meaning that I blogged 8 times this month but NO they were not spread out evenly over the month with 2 per week.

So based upon the mixed progress for March, here are my goals for the month of April:
1.) Complete the Winter Mandala
2.) Complete the binding on the Patriotic Table Runner
3.) Complete the Christmas Table runner top and quilt it together.
4.) Complete the geometric placemats.
5.) complete 10" of the Seed Stitch project
6.) Work on another of my WIP/Turtle Trot Projects
7.) Stich From my Stash

Hopefully it will be achievable! Happy stitching everyone!